Set riser boards to the marks and fasten them to the walls or side boards.
Pouring concrete steps between walls.
Mix the concrete and bring it to the site in wheelbarrow loads.
Their idea was to dig a footing across the front and screw angle to the tile along the side wall and rear wall to keep the slab from settling.
Before pouring concrete steps coat the forms with a release agent.
Available from diy stores and ready mix concrete companies these contain soluble emulsions that form a protective film when sprayed directly onto the surface of newly poured concrete slabs or walls.
Finish the surface of the wall as desired.
When all the concrete was poured carlos began using a magnesium float to strike off the concrete to create a relatively smooth surface.
My question is about pouring the concrete.
He also checked that each step was perfectly level.
If the wall exceeds four feet in height footings should be poured separately.
Follow the instructions on the bag of cement and mix accordingly.
When forming between walls or other flat surfaces such as plywood where you will be able to mark riser locations positioning risers is easy.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
I had a company give me an estimate.
If that extra inch will cause the step to overhang the sidewalk place a strip of 1 2 in thick foam under the form to create a gap between the step and the sidewalk.
After each wheelbarrow of concrete one of the guys would use a shovel to work the concrete around eliminating voids.
Pour concrete put up a wall.
Build a concrete form to match the original height of the step.
Allow concrete to cure.
Pour the retaining wall.
If steps are longer than 4 feet install stringers to support risers and keep stair lines straight.
Out from the old face of the step.
Tap the sides of the forms and risers with a hammer and jab a 2x4 up and down in the mix to drive air bubbles out.
Roll the wheelbarrow of cement over to your wooden forms and pour the cement into the footing and form area.
Create contraction joints every 4 6 feet.
Locate the front of the form about 1 in.