Poured or cast walls must have horizontal steel top and bottom.
Poured concrete basement walls vs block.
When walls are tall pouring is much faster than using block.
It would take a small army of masons to achieve the same results building with concrete block.
Poured concrete is a huge time saver.
A concrete block foundation can be stronger than a poured concrete foundation.
Also the porosity of cmus makes waterproofing more difficult in a full foundation.
Poured vs block foundations.
Also poured walls have a compressive and flexural strength several times that of concrete block.
Poured concrete foundations are fire resistant.
Block cores must be filled with pea gravel concrete.
Reinforcing steel can be used to strengthen either material.
When you re building a new home you want the highest quality for the best possible price.
Without joints poured walls possess a greater lateral strength which essentially means they have a greater ability to resist pressure presented by water and the soil from the outside.
Block walls can be as strong or stronger than poured walls.
Be sure you use lots of steel no matter which material you.
March 3 2014 michael luckado.
Last updated on september 16 2019.
Block and concrete are strong in compression but weak in tension.
Cinder blocks require less special equipment to put in place than poured concrete and are easier to lay yourself.
So you re building a basement.
Poured concrete vs block wall tips just below.
For a poured wall extra height just means taller forms and more materials.
A poured wall doesn t have joints like a cinder block wall so it should come as no surprise that it is naturally easier to waterproof.
According to the national association of home builders conventional 8 inch concrete cinder blocks cost around 1 46 per square foot of foundation before installation.
Fast tips for poured vs block walls.
Advantages of poured concrete foundation.
Poured concrete foundation walls are arguably stronger than cinder block foundation walls.
A poured concrete wall takes less time to install has more mass is joint free typically is between 6 and 10 inches thick and with the steel rebar that is placed inside the wall it assures you of a less problematic way of constructing a basement wall.
Block is more labor intensive especially as the height of the wall increases.
They differ in the size of gravel used and that concrete blocks are hollow while poured concrete is solid.
Reinforcing steel needs to be in block walls both vertical and horizontal.
Poured concrete foundations provide a high level of strength and durability and can last for decades.