Plywood used for roof decking is typically called sheathing and carries a grade stamp indicating its load and span ratings and other performance factors.
Plywood roof sheathing installation.
If using asphalt or fiberglass shingles postpone shingle installation as long as possible.
Common roof sheathing applications and installation recommendations are described in the related publications listed at right.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Plywood particle board or wafer board roof sheathing is most commonly used being low in cost and easy to apply.
Install shingles according to manufacturer s recommendations.
Choose an exterior c d grade.
Properly fasten panels including fastening and spacing hints step 4.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
How to install roof sheathing 1.
Position the first piece of plywood.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Use a staggered pattern when building up rows of plywood sheets.
This will provide time for roof sheathing to adjust to humidity and moisture conditions.
This video shows how some roofs fail under heavy winds in uplift situations.
And scroll down to see more details on each with installation hints and tips below.
Plywood and oriented strand board osb are used in roof sheathing systems ranging from simple single family residences to large commercial buildings.
The plywood is nailed at roughly 150 mm spacings ensuring the ends finish on the centre line of a truss.
Cover sheathing with.
Correct installation of roof sheathing will ensure the best performance and help reduce complaints and callbacks.
Keep these tips in mind when roofing in hurricane areas.
Plywood is layers of wood plywood is made.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
Check the nailing surface is level step 2.
Make sure to leave a 2 3 mm gap between boards.
For best appearance use heavier weight shingles or laminated or textured shingles.
Installing the plywood sheets.